Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220473
    Date de publication: 19 janvier 2023

    Promoteur – Intermédiaire Financier

    ENBW ENERGIE BADEN-WUERTTEMBERG AG,SPECIAL PURPOSE ENTITY(IES)/FUND

    Lieu

    Description

    The project concerns a large scale, fixed-bottom offshore wind farm with a total nominal capacity of 960 MW, comprising 64 wind turbines of 15 MW unit capacity, monopile foundations and inter-array cabling. The grid connection, comprising an offshore converter station as well as two HVDC export cables at a distance of over 120km subsea and 110km onshore, is implemented by the responsible Transmission System Operator (TSO) outside the scope of the Bank's financing.

    Additionality and Impact

    This operation consists of the construction and operation of new offshore wind farm that will contribute the achievement of the 2030 decarbonisation targets set out in the National Energy and Climate Plan (NECP) of Germany.


    The financing of this project contributes to Bank's lending priority objectives on Energy (Renewable Energy), Climate Action (transversal) and Environmental Sustainability.


    In terms of addressing market failures, the offshore wind farm primarily reduces carbon and air pollution externalities, through the reduction of carbon emissions and air pollution.


    As the project relies on revenues from the market (the wholesale market and unsubsidised commercial power purchase agreements), in a sector characterised by incomplete markets, the project improves market efficiency and competition.


    The offshore wind farm is expected to generate a high social benefit due to (i) generating clean and renewable power at a cost below the cost of fossil-fuel based alternatives in Germany and (ii) knowledge externalities.


    Overall, the operation is expected to yield good quality and results, thanks to avoided GHG emissions, and employment creation. The project is supported through adequate governance arrangements by the promoter.


    The Bank's support to the project will support the crowding in of other financiers given its experience in the sector which gives a quality stamp to the project.


    Objectifs

    The offshore wind farm will primarily reduce carbon and air pollution emissions, which are externalities the market fails to address. Moreover, the project should foster the integration of new, variable renewable generation technologies in the market. The EIB financing would thus fill a market gap in the development of new renewable capacity. That would include a financing gap for projects that try to develop new capacity with more market-exposed structures and instruments.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 1075 million

    Coût total (montant approximatif)

    EUR 2383 million

    Aspects environnementaux

    The project is located in a dedicated zone for offshore wind development in the German Economic Exclusive Zone of the North Sea. Wind farms adhere to Annex II of Directive 2014/52/EU amending the EIA Directive 2011/92/EU, thereby leaving it to the competent authority to determine if an Environmental Impact Assessment (EIA) is required. The competent authority required an EIA to be conducted, and the promoter delivered the project's EIA studies as part of permitting process. Compliance of the authorisation process with relevant EU Directives will be verified during appraisal.

    Passation des marchés

    The promoter has been assessed by the EIB as being a public undertaking being subject to EU rules on public procurement or concessions. The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 22/12/2022

    Milestone
    À l'examen
    Approuvé
    Signé
    14 décembre 2022
    22 décembre 2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Énergie