Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220143
    Date de publication: 17 octobre 2022

    Promoteur – Intermédiaire Financier

    ILIAD SA

    Lieu

    Description

    The project relates to the expansion of a "fibre-to-the-home" (FTTH) telecommunication network throughout France from 2022 to 2024.

    Additionality and Impact

    France remains last in Europe in availability of Next Generation Access Broadband with 69% of households covered (average of 87%) and 52% very high capacity network coverage (59% average). The project contributes to France's national broadband programme "France Très Haut Débit" that sets out the targets of fibre based fast broadband access for households by 2025. France predominantly opted for establishing and widening its broadband network infrastructure through FTTH technology.

     

    The project is aligned with the Gigabit Society's initiative to enable households to have access to broadband connections of at least 100Mbps upgradeable to Gigabit speed by 2025. The project supports the goal of the Electronic Communication Code to promote the rollout of very high capacity network and foster infrastructure competition. The project is aligned with the recently established 2030 EU Digital Compass targets.

     

    EIB's involvement provides Iliad with a highly flexible financial product (e.g. flexible drawdowns, lengthy availability period, etc.). The combination of relatively favourable pricing and a maturity adjusted to the project's life cycle, paired with the Bank's capacity to extend a sizable loan from one source are highly appreciated by the client. The loan provides a signalling effect to the soundness and quality of the project.

    Objectifs

    With the implementation of the project, the promoter plans to extend the number of activated customers. The project will be implemented mainly in areas with a medium population density and in areas with a low population density.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 300 million

    Coût total (montant approximatif)

    EUR 1145 million

    Aspects environnementaux

    Investments in fixed telecommunications projects (mainly civil works for urban underground fibre roll-out) do not fall under Annex I and II of Directive 2014/52/EU amending the EIA Directive 2011/92/EU.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

    Statut

    Signé - 13/12/2022

    Milestone
    À l'examen
    Approuvé
    Signé
    24 novembre 2022
    13 décembre 2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Télécom