Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20210736
Date de publication: 27 juin 2022

Promoteur – Intermédiaire Financier

FREYR BATTERY SA

Lieu

Description

The project concerns the construction and operation of a large plant for industrial scale production of clean lithium-ion battery cells in Norway. The cells are to be sold for making Battery Energy Storage Systems. The project seeks to implement an innovative manufacturing process technology under a technology license agreement that will allow higher resource and energy efficiencies compared to conventional technologies. By the use of renewable power, the project aims to produce battery cells with the lowest carbon footprint. The promoter aims to use sustainably sourced and traceable materials. The project's core strategy is to develop a European battery industry and accelerate the decarbonisation of energy and transportation systems.

Objectifs

The project concerns the manufacturing of a new type of advanced li-ion electrodes and battery cells and could make a substantial contribution to the development of a European battery industry. The objective is to cater for the energy transition by supplying the growing demand for Battery Energy Storage Systems with cutting-edge battery cells that offer higher energy density, longer lifetime, improved safety, lower cost, sustainably sourced materials, and near-zero carbon footprint.

Secteur(s)

Montant BEI envisagé (montant approximatif)

not disclosed

Coût total (montant approximatif)

not disclosed

Aspects environnementaux

The project concerns capital investments for the production of lithium-ion electrodes, cells and batteries, falling under the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU. All environmental, health and safety issues including environmental and operational authorisations will be reviewed during the due diligence process.

Passation des marchés

The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

Statut

À l'examen - 5/01/2022

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Norvège Industrie