Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190800
    Date de publication: 25 juin 2020

    Promoteur – Intermédiaire Financier

    STREDOCESKY KRAJ

    Lieu

    Description

    The project, structured as a multisector Framework Loan, comprises the schemes implemented under the investment programme of the Region of Central Bohemia that will improve the regional infrastructure, in particular in the sectors of healthcare, transport, social care, education and energy efficiency of public buildings.

    Objectifs

    The investment programme is expected to bring economic benefits to the Region in terms of delivery of public services, mainly in healthcare, social care and education, due to construction or rehabilitation of public buildings with an impact on the quality of life and life expectancy. The healthcare schemes will contribute to the construction, modernization and optimization of the capacities of the beneficiary medical facilities. The investment programme will enable those medical facilities to achieve higher efficiency, increased service quality, energy savings, as well as improved emergency preparedness (e.g. in connection with viral pandemics). Further improvements are expected in intra-regional connectivity with an impact on road safety and reduced traffic congestion. The majority of schemes are small and shall be implemented between 2020 and 2024.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    CZK 3050 million (EUR 114 million)

    Coût total (montant approximatif)

    CZK 3968 million (EUR 149 million)

    Aspects environnementaux

    The project comprises a multi-scheme operation classified as a Framework Loan and some of the schemes may eventually fall under Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU. Should any such scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 2009/147/EC), the Bank would require the promoter to act according to the provisions of the aforementioned Directives as transposed into the national law. It is a requirement that all schemes must be implemented in compliance with the EU environmental legislation. Environmental and efficiency improvements in public buildings will be required to comply with the provisions of the EU Directive on Energy Performance of Buildings 2010/31/EU.

    Passation des marchés

    The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 30/09/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    République tchèque Transports Infrastructure composite