Date de publication: 10 mai 2019
Promoteur – Intermédiaire Financier
PUBLIC ENTITY(IES)Lieu
Description
The project consists of an allocation under the Structural Programme Loan (SPL) Romania EU CO-Financing for Environment 2014-20 (2015-0548) aiming to achieve compliance with the EU Drinking Water and Urban Wastewater Treatment Directives in the County of Galati.
Objectifs
The project is focused on fulfilling the compliance requirements for water and wastewater (Urban Waste Water Treatment Directive 91/271/EEC and the Drinking Water Directive 98/83/EC), of agglomerations with more than 2 000 PE (Population Equivalent) for wastewater collection and treatment, and localities with more than 50 inhabitants for water supply. In this respect, the proposed investments envisage extending the service coverage for drinking water supply and wastewater collection and treatment, as well as addressing the deficiencies of the existing systems.
Secteur(s)
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Montant BEI envisagé (montant approximatif)
EUR 17 million
Coût total (montant approximatif)
EUR 151 million
Aspects environnementaux
All the project components were screened according to the Annex II of the Environmental Impact Assessment (EIA) Directive. For four components (Galati, Beresti, Tecuci and Movileni) a full EIA was required and the Environmental Permits were issued.
Passation des marchés
The Bank will require the promoter (Regional Operating Company) to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.
Statut
Approuvé - 21/06/2019