Date de publication: 21 février 2019
Promoteur – Intermédiaire Financier
JIHOMORAVSKY KRAJLieu
Description
The project will finance the acquisition of around 37 new passenger trainsets to increase the quality of rail services in the South–Moravia region.
Objectifs
The project, which is expected to promote rail travel and discourage the use of private vehicles, will contribute to reduce greenhouse emissions and improve road safety. It is expected therefore to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
CZK 2565 million (EUR 100 million)
Coût total (montant approximatif)
CZK 7143 million (EUR 280 million)
Aspects environnementaux
The project will contribute to develop a more sustainable transport in the region, in line with EU objectives. The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive (EIA) 2011/92/EU as amended by Directive 2014/52/EU as manufacturing and use of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitats Directive 92/43/EEC for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal.
Passation des marchés
The EIB will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 89/665/EEC 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The Notice on the opening of the procurement procedure for the purchase of rolling stock has already been announced in the EU Official Journal (call for tender TED 2016 / S 240-437117).
Statut
Signé - 15/10/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).