    Référence: 20170881
    Date de publication: 11 septembre 2018

    Promoteur – Intermédiaire Financier

    SLOVENSKE ELEKTRARNE AS

    Lieu

    Description

    The project consists of an investment programme to reinforce the safety of existing units of the Mochovce 1,2 and Bohunice V2 nuclear power plants in Slovakia.

    Objectifs

    The project will contribute to improvements in security, safety and reliability of low carbon electricity supply.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 60 million

    Coût total (montant approximatif)

    EUR 153 million

    Aspects environnementaux

    Based on their technical characteristics none of the programme components will require an Environmental Impact Assessment. The implementation will take place at the existing nuclear operational sites. The works are mostly related to replacement or refurbishment of existing equipment. The project activities are expected to have minimal environmental impact. The typically negative impacts are mainly temporary, relate to construction and installation works and can be well managed by appropriate measures taken during project implementation. The investments are expected to enhance nuclear and industrial safety and will introduce improvements in the areas of fire protection, occupational health and safety, radiation protection and environmental protection.

    Passation des marchés

    For procurement of goods, services and construction works related to the power generation the promoter follows public procurement procedures. The Bank will confirm that the procurement procedures implemented by the promoter ensure an appropriate selection of works, goods and services offered at competitive prices and in a timely manner.

    Statut

    Signé - 10/12/2018

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Slovaquie Énergie