Date de publication: 18 janvier 2017
Promoteur – Intermédiaire Financier
PRIVATE ENTITY(IES)Lieu
Description
The project will finance the construction of an eco-campus in Fez, with research facilities and equipment, teaching facilities, a student residency and sport facilities.
Objectifs
This new institution is co-developed with several European academic partners in order to offer training up to European standards, degrees certified for the European market, conduct high quality research and create cultural and economic bridges between the two shores of the Mediterranean Sea.
Secteur(s)
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 84 million
Coût total (montant approximatif)
EUR 147 million
Aspects environnementaux
A project with similar characteristics within the EU would be classified under Annex II of Directive 2011/92/EU as amended by Directive 2014/52/EU, thus requiring a decision by the competent authority as to whether or not a formal environmental impact assessment (EIA) process is required. In an EU member state, universities specifically mentioned in the EIA Directive would not normally require an EIA. However, the projects could be covered by Annex II of the directive in relation to urban development and thus be subject to an EIA. The need for environmental studies and assessment has been reviewed during the appraisal process. The promoter has provided the EIB with the non-technical summary of the EIA carried out at building permit stage.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Statut
Signé - 7/07/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).