Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150283
    Date de publication: 14 juillet 2015

    Promoteur – Intermédiaire Financier

    IREN SPA

    Lieu

    Description

    Investment programme in district heating networks and waste management facilities

    Objectifs

    The main purpose of such investments in district heating would be to improve the operational flexibility of the system (peak demand coverage) and to reduce the absolute amount of local air pollutants (NOx, SO2) by replacing individual smaller, fossil-fuel-fired heating boilers in residential and public buildings. Investments in the waste sector would contribute to increasing materials recovery from residual municipal waste and thereby decrease environmental and climate change impact from current waste treatment and disposal operations.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 140 million

    Coût total (montant approximatif)

    EUR 280 million

    Aspects environnementaux

    By virtue of their technical characteristics, some of the indicatively assumed project components for financing might concern investments which could fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2014/52/EU), which requires the competent national authority to determine the need for an EIA. A condition will be included in the finance contract requiring that the promoter completes any EIA or nature conservation area impact assessment and receives approval from the competent authorities prior to allocating the Bank’s funds to the project scheme, including providing copies of the relevant documents, including the consents, to the Bank. Residual environmental impact of the project schemes assumed to be supported by the Bank is expected to be minimal.

    Passation des marchés

    The promoter is well known to the Bank and thus its procurement procedures are expected to be in compliance with Directive 2014/25/EU on utilities sector procurement.

    Statut

    Signé - 9/12/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Déchets solides Énergie