Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150275
Date de publication: 20 septembre 2016

Promoteur – Intermédiaire Financier

HAMBURGER STADTENTWAESSERUNG

Lieu

Description

Financing of investments in the Hamburg sewerage system in the years 2016-2019

Objectifs

The project concerns the investment programme of Hamburger Stadtentwaesserung for the period of 2016-2019 that will improve the efficiency and sustainability of wastewater services in Hamburg. It includes rehabilitation and upgrading of sewer systems and necessary lifecycle investments at the wastewater treatment plants. The project will assist in maintaining compliance with the Water Framework Directive 2000/60/EC and the Urban Wastewater Treatment Directive 91/271/EEC.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 160 million

Coût total (montant approximatif)

EUR 420 million

Aspects environnementaux

The schemes included in the project fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU. Environmental impact assessment procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. Where appropriate the requirements of the Habitats and Birds Directives are applied. The Bank's appraisal will focus on the promoter's environmental management capacity to properly apply these EU directives. All relevant key documents for the project will be published, in line with the Bank's disclosure policy.

Passation des marchés

The promoter is a contracting authority within the meaning of Procurement Directive 2014/25/EU. All project contracts shall be tendered in accordance with the relevant applicable EU procurement legislation - Directive 2014/25/EU and Directive 2007/66/EC in this case - as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 19/01/2017

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Eau, assainissement