Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20140570
Date de publication: 15 avril 2015

Promoteur – Intermédiaire Financier

HAMBURGER HOCHBAHN AG

Lieu

Description

The project comprises a large number of schemes for the extension, reconstruction, rehabilitation and upgrading of parts of Hamburg’s metro infrastructure.

Objectifs

Hamburger Hochbahn AG is continuously investing in the modernisation of its assets to maintain adequate safety and quality service standards. The project will contribute to improving the quality of public transport service in terms of travel time, comfort and reliability and will uphold the attractiveness of public transport in the metropolitan area, thus contributing to a reduction of reliance on private cars and its negative impact on the environment and congestion.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 220 million

Coût total (montant approximatif)

EUR 480 million

Aspects environnementaux

An environmental impact assessment (EIA) for the relevant project components was carried out in the context of the building permit procedure. It was subject to broad public consultation and has been approved by the competent authority. Regarding the rehabilitation, reconstruction and upgrading schemes, based on the nature of such works it is expected that none of those schemes will fall under either Annex I or Annex II of the EIA Directive 2011/92/EC. However, the need for a screening procedure or for a full EIA for any of the schemes will be assessed during appraisal once the scope of the project is defined, as well as any potential significant or negative impact of the project on areas included in the Natura 2000 network (according to the Habitats Directive 92/43/EEC and the Birds Directive 2009/147/EC). The question of the project falling within a plan or a programme requiring a strategic environmental assessment (SEA) in line with EU Directive 2001/42/EC will also be further examined during appraisal.


Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 18/11/2015

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Transports