Date de publication: 10 avril 2014
Promoteur – Intermédiaire Financier
London Borough of EnfieldLieu
Description
Brownfield site redevelopment with social housing to be operated by the London Borough of Enfield.
Objectifs
Under the Framework Loan operation "London Green Fund Co-financing Loan", it is proposed to allocate funding to a large sub-project above the EUR 50m equivalent threshold: The Meridian Water redevelopment and regeneration project is located in the London Borough of Enfield, situated in North London. The sub-project comprises Brownfield site redevelopment to provide rental social housing to be owned by the borough. It occupies a strategic location within the London-Stansted-Cambridge Corridor. Situated within the Upper Lee Valley, it is designated as an Opportunity Area within the Mayor of London's strategic plan (the 'London Plan'). The development will bring under-utilised Brownfield land back into productive economic use.
Commentaires
The project is still subject to necessary clearances/approvals.
Secteur(s)
- Aménagement urbain - Construction
Montant BEI envisagé (montant approximatif)
GBP 39 million (EUR 47 million)
Coût total (montant approximatif)
GBP 77 million (EUR 95 million)
Aspects environnementaux
Compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2011/92/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the urban renewal, rehabilitation and reconstruction investments will be reviewed during project appraisal. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed during project appraisal.
Passation des marchés
The Bank will require the borrower to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.
Statut
Approuvé - 4/06/2014
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).