Référence: 20130366
Date de publication: 4 juin 2014

Promoteur – Intermédiaire Financier

REGIE DE DISTRIBUTION ET DE PRODUCTION DE L’EAU ET DE L’ELECTRICITE

Lieu

Description

The Jiji and Mulembwe Hydropower Project consists of the construction of two run-of-the-river hydropower plants Jiji (31.5 MW) and Mulembwe (16.5 MW) in southern Burundi as well as an 80 km 110 kV transmission line to evacuate the power to the capital Bujumbura, which is interconnected at national and regional level. The project also includes the supply of electricity to rural communities in the vicinity of the power plants.

Objectifs

The project will almost double the installed power capacity in Burundi, allowing increased access to electricity from a current level of around 4% of the population. The project will contribute to increased supply, reliability and affordability of electricity thus directly contributing to improving living standards, economic activity, growth and development.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 98 million

Coût total (montant approximatif)

EUR 199 million

Aspects environnementaux

The project is subject to a comprehensive ESIA, in line with the principles of EU legislation, including formal public consultation. The project is not expected to have a significant effect on any protected or environmentally-sensitive areas, including bird migration routes. Up to 221 households are expected to require resettlement, mostly as a consequence of the new transmission line. Appropriate compensation will be provided to people affected by the project in accordance with national legislation and lenders’ requirements.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be carried out in accordance with the Bank’s Guide to Procurement.

Statut

Signé - 11/12/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Burundi Énergie