    Référence: 20120286
    Date de publication: 22 mai 2013

    Promoteur – Intermédiaire Financier

    SOCIETE MAURITANIENNE DES POSTES

    Lieu

    Description

    The project includes construction of inter-urban fibre optic backbone links in the North, South and South-East of Mauritania, with international links to Mali. The deployment of the network is divided into 4 main segments which have a total estimated length of 1 660 km. The cables will enable connectivity to inland cities such as Atar, Choum, Rosso, Boghé, Kaédi, Sélibaby, Kiffa, Aioun and Nema.

    Objectifs

    The project will result in extension of the terrestrial backbone network in the country, connecting nine larger inland cities as well as smaller communities on the route, eventually connecting them to the ACE (Africa Coast to Europe) submarine cable. This will significantly improve the availability and quality of telecommunications services in the area and is expected to considerably reduce end user prices.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 15 million

    Coût total (montant approximatif)

    EUR 31 million

    Aspects environnementaux

    The project could entail physical and economic displacement, but the significance in terms of number of people affected and permanence of the impacts needs to be further assessed and will depend on the final alignment of the cables. Environmental and Social studies are part of the project preparation and will take into account EIB Environmental and Social guidelines. The Bank’s services will verify how the recommendations of the studies will be applied in the project and operation contracts. After mitigation, the environmental impact of the project is expected to be minor.

    Passation des marchés

    In the context of planned co-finance with the World Bank, it was agreed that the World Bank procurement procedures will be applied to the project. It will be required to apply competitive tender procedures and ensure EU companies will not be negatively discriminated against.

    Statut

    Signé - 27/10/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Mauritanie Télécom