    Référence: 20120199
    Date de publication: 6 novembre 2012

    Promoteur – Intermédiaire Financier

    WASSERLEITUNGSVERBAND NOERDLICHES BURGENLAND

    Lieu

    Description

    Installation of a trans-boundary water supply system linking the systems between the water associations of the northern and central part of Burgenland and of Sopron.

    Objectifs

    This project will improve the water infrastructure in the dynamic Pannonian Basin around Lake Neusiedl (Austria/Hungary). Measures comprise additional water mains, connections between pipe systems, well fields, tanks/reservoirs, booster pumping stations, UV disinfection, rehabilitation and extension of waterworks.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 39 million

    Coût total (montant approximatif)

    EUR 100 million

    Aspects environnementaux

    Project components comprise additional water mains, connections between pipe systems, well fields, tanks/reservoirs, booster pumping stations, UV disinfection, reinstatement and extension of waterworks. Some of these components may fall under Annex 1 or Annex 2 of the EIA Directive 2011/92/EU. The project area is close to or in a Natura 2000 site (Birds Directive and Habitats Directive). Project impact and mitigation (if required) as well as regulatory requirements will be assessed during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 12/06/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Eau, assainissement