Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110396
    Date de publication: 10 janvier 2012

    Promoteur – Intermédiaire Financier

    Slovak Republic – Ministry of Transport

    Lieu

    Description

    The project concerns the rehabilitation and modernisation of 18.9 km of the existing twin track electrified railway line (3kV DC) between Žilina - Krásno nad Kysucou, in the line Žilina -Cadca, located in northern Slovakia. The modernised line will allow maximum speed of 140 km/h (160 km/h for tilting trains). Rehabilitation works in 2 stations (Kysucké Nové Mesto and Krásno nad Kysucou) and 4 train stops are also part of the project.

    Objectifs

    The project will increase the quality of rail services, and thereby will promote sustainable transport solutions in line with EU objectives. Furthermore, the infrastructure is located in a Convergence Region, and thereby improves accessibility and potentially facilitates regional development.

    Commentaires

    Under Framework Loan.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 53 million

    Coût total (montant approximatif)

    EUR 196 million

    Aspects environnementaux

    The project falls under Annex II of the EIA Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC.The Competent Authority decided that the project would not be subject to EIA, based on a preliminary environmental study. The environmental management of the project is in line with the EU environmental acquis. The project does not impact on any special areas of conservation (Natura 2000 network) and would result in about 3 kton of CO2 savings per year, mainly because the improved railway service would reduce freight transport by truck.

    Passation des marchés

    The contracting authority, ŽSR, is a public promoter obliged to comply with the relevant applicable EU project legislation (EU directive 2004/18) and National Public Procurement legislation. The Promoter has confirmed that contracts for the implementation of the project have been tendered and awarded in accordance with this legal framework and that no claims have been raised against the project procurement. The promoter has complied with the requirement of publication of tender notices in the EU official Journal for the project contracts.

    Statut

    À l'examen - 10/01/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovaquie Transports