Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110166
    Date de publication: 10 juin 2011

    Promoteur – Intermédiaire Financier

    Syndicat des Transports d'Ile de France.

    Lieu

    Description

    Construction of four new tram lines (T5, T6, T7 and T8) to serve the municipalities of the first ring of suburbs around Paris and purchase of rolling stock.

    Objectifs

    The project is designed to improve the quality of public transport, encourage a switch to soft modes of transport and reduce the use of private cars.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 600 million

    Coût total (montant approximatif)

    EUR 1 687 million.

    Aspects environnementaux

    The tram lines come under Annex II of Directive 85/337/EEC amended and have been subjected to an impact assessment under the Declaration of Public Utility procedure. They are also included in the Master Plan for the Île-de-France Region currently being approved and have been subjected to a strategic environmental assessment. The lines pass through urban areas and are unlikely to have significant impacts on Natura 2000 conservation sites. Line T6 includes a 1.6 km underground section under the forest of Meudon, which features on the French list of natural areas of ecological, fauna and flora interest but is not considered a Natura 2000 site. The construction of the tram line in a tunnel will minimise the impact on the forest. Given the project's virtuous objectives, and apart from certain temporary negative effects during the construction phase, the overall environmental impact can only be positive.

    Passation des marchés

    Tram lines in Île-de-France are currently operated by RATP under a concession contract signed with STIF. Most of the procurement has been carried out by RATP in its capacity as delegated contracting authority for the transport system using competitive tendering (notice in the Official Journal of the European Union). The procedures adopted comply with current regulations.

    Statut

    Signé - 4/10/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Transports