Date de publication: 7 décembre 2011
Promoteur – Intermédiaire Financier
OFFICE NATIONAL DE L ELECTRICITE ET DE L EAU POTABLELieu
Description
The project is an investment programme aimed at reinforcing and extending the electricity transmission network of Morocco. The programme consists of 24 electricity transmission schemes overall encompassing the implementation of circa 850 km of overhead lines and 4 600 MVA of transformation capacity.
Objectifs
The main purpose of the project is to enable the integration into the grid of new generation resources, including renewable energy, extend the transformation capacity to the distribution grid and contribute to improve the reliability of supply
Commentaires
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 180 million
Coût total (montant approximatif)
EUR 443 million
Aspects environnementaux
Moroccan EIA legislation requires environmental and social impact assessments for the main project schemes in the programme. Such assessments need to be carried out in line with EIB guidelines, implying a follow-up during the implementation of the programme as and when individual EIAs become available.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement.
Statut
Signé - 14/12/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).