Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110033
    Date de publication: 11 octobre 2011

    Promoteur – Intermédiaire Financier

    Ministry of Transport of the Czech Republic;
    Managing Authority of the Operational Programme of Transport in the Czech Republic

    Lieu

    Description

    The project consists of the construction of the Kroměříž East – Říkovice section of the D1 motorway (11.3 km in category D 26.5/120 and 3.375 km in category R 24.5/120) and of section Skalka – Hulín of the R55 expressway (10.8 km) in the Zlín region in the south-east of the Czech Republic.

    Objectifs

    The project will develop the transit connections of the industrial area of Ostrava with Brno and Prague, facilitate the exchange with Poland on the TEN-T route Gdansk – Brno / Bratislava – Vienna (Priority Project No 25) and will also improve the accessibility of Zlín and Olomouc regions. It will furthermore provide a bypass to the town of Hulín.

    Commentaires

    Under framework loan.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to CZK 3 973 million (EUR 160 million)

    Coût total (montant approximatif)

    CZK 11 962 million (EUR 479 million)

    Aspects environnementaux

    The environmental impact assessment commenced in 1997 and was completed in 1999. Feasibility studies commenced in 1996 and were completed in 2001 for R55-5503, and 2004 for D1-0135. The building contract documentation was issued in 2005 for D1-0135 and 2008 for R55-5503.

    Passation des marchés

    EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll. The contract notices for the international open tender were published in the Official Journal of the European Union (OJEU). Both main contracts were published in the OJEU under the reference number 2007/S169-208403 on 04.09.2007 for D1-0135, and reference number 2008/S28-037449 on 09.02.2008 for R55-5503. The procurement process is acceptable to the Bank.

    Statut

    À l'examen - 11/10/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    République tchèque Transports