Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100620
    Date de publication: 6 mai 2011

    Promoteur – Intermédiaire Financier

    Private company

    Lieu

    Description

    The project concerns the replacement of a coal-fired boiler in an existing power plant in Poland with a new fluidised-bed boiler designed to combust 100% biomass. The existing steam turbine and generator will be refurbished and allow the production of around 200 MWe.

    Objectifs

    The project will promote the development of a power system in a convergence region. It will contribute to meeting electricity demand using a renewable source within the national Polish market dominated, for more than 90%, by coal fired power plants. The use of forest and agricultural biomass should contribute to diversification of fuel and electricity supply and hence increase security of supply. The project is therefore eligible under article 309 a) Economic and Social Cohesion, and c) Common Interest of the Treaty on the Functioning of the European Union. The financing of this project will contribute to the Bank’s lending priority policy on convergence regions, diversification and security of energy supply and renewable energy.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 120 million

    Coût total (montant approximatif)

    EUR 240 million

    Aspects environnementaux

    Due to its capacity (plant over 300 MWth), the project is subject to the Annex I of the EIA Directive (85/337/EC and amendments) and was required to undergo a full Environmental Impact Assessment (EIA). The 2010 EIA study found the project’s impact on environment acceptable and the environmental permit was granted by the competent authorities. The project is a brown field investment and its net environmental impact is positive due to the elimination of coal combustion unit.

    Passation des marchés

    The promoter is not a public undertaking in the sense of the Art. 2.1(b) of the new Utilities Directive 2004/17/EC. It is also not enjoying any special or exclusive rights as the Polish electricity sector legislation allows private and public power generation companies to have equal access to the high-voltage network on objective terms. Therefore, the promoter is not subject to the Directive 2004/17/EC addressing procurement in the utilities sector. Nevertheless, the promoter employs a competitive system of tendering and bid evaluation.

    Statut

    Signé - 21/12/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Énergie