Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20100591
Date de publication: 28 avril 2011

Promoteur – Intermédiaire Financier

Autoridad Portuaria de la Bahía de Cádiz.

Lieu

Description

Construction of the new container terminal

Objectifs

The project consists of the construction of the first phase of a new container terminal at the port of Cádiz to accommodate future traffic growth.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 60 million

Coût total (montant approximatif)

Up to EUR 137.7 million

Aspects environnementaux

The project falls under Annex II of EU EIA Directive and, as such, is required to comply with the requirements of the EU EIA Directive 85/337/EC, amended by Directives 97/11/EC and 2003/35/EC. The container terminal has been the subject of a full EIA, which included environmental impact studies and public consultation.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

Statut

Signé - 22/09/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Transports