Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100581
    Date de publication: 28 mars 2011

    Promoteur – Intermédiaire Financier

    Administração dos Portos do Douro e Leixões, S.A. (“APDL”)

    Lieu

    Description

    The project consists of the development of the port of Leixões, in the North of Portugal. It includes the construction of a logistics platform in the direct vicinity of the port, as well as the development of a new “Cruise Terminal”, which is composed of a cruise terminal, a marina, and a Science and Technological Sea Park.

    Objectifs

    The project is eligible under Article 309 point (a) projects for developing less-developed regions and point (c) common interest on two counts: trans-European transport networks and Sustainable Transport.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Indicatively EUR 70 million

    Coût total (montant approximatif)

    Indicatively EUR 155 million

    Aspects environnementaux

    The project falls under Annex I of the EIA Directive and, as such, is required to comply with the requirements of the EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC. The project was the subject of EIAs, with environmental authorizations granted in February and May 2009. All relevant EIA documentation (including compliance with the EU Habitats Directive 92/43/EEC) will be the subject of review during project appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/ shall be tendered in accordance with the relevant applicable EU procurement legislation, with parallel publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 7/06/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Transports