Référence: 20100546
Date de publication: 21 décembre 2010

Promoteur – Intermédiaire Financier

Fortum Oyj, Espoo, Finland

Lieu

Description

Construction of waste-to-energy CHP plants in Brista, Sweden and Klaipeda, Lithuania, and implementation of a digital remote metering infrastructure on the low voltage level in Finland.

Objectifs

Installation of remote meters will contribute to improve remote reading and demand side management, real time consumption information and differential pricing according to the systems load.

Construction of two waste fuelled CHP plants will contribute to diversion of waste from landfill disposal in line with EU targets, and will in the process reduce greenhouse gas emissions from landfills and improve security of energy supply.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 250 million

Coût total (montant approximatif)

EUR 500 million

Aspects environnementaux

The project consists of installation of remote reading meters in Finland and implementation of new, efficient  waste-fuelled CHP power plants in Sweden and Lithuania. The projects are not expected to cause significant  negative impacts to Natura 2000 sites or to other sites of nature conservation importance. The project will  reduce the amount of waste that is landfilled and it will provide a waste recovery route instead of existing  disposal route. The project will furthermore provide incentives for energy conservation trough installation of  remote meter reading.

Passation des marchés

Based on the information that has been received, the procurement procedures applied by the promoter for the project schemes follow the requirements of EU legislation. The promoter has internal, binding guidelines in place and regularly publishes contract notices in the EU Official Journal in line with the applicable Directives. For the project schemes concerned, TED lists several related contract notices. The procurement processes of each scheme will be further examined during the appraisal.

Statut

Signé - 21/03/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Finlande Suède Énergie Déchets solides