Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20100480
Date de publication: 18 octobre 2010

Promoteur – Intermédiaire Financier

Energie Steiermark AG

Lieu

Description

The project consists of the construction and operation of two 19 MW hydro schemes (KW Gössendorf and KW Kalsdorf) on the river Mur in the region of Styria.

Objectifs

The project supports national and EU renewable energy objectives.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 80 million.

Coût total (montant approximatif)

Up to EUR 162 million.

Aspects environnementaux

An EIA has been performed for both plants. The promoter has provided the Bank with a copy of the Non Technical Summary and the Environmental Permit. In line with the Bank's guidelines, details of the Environmental Impact Assessment, including adequacy of proposed mitigation, compensation and environmental monitoring will be assessed, as well as the promoter's capacity and procedures to ensure compliance with environmental and biodiversity regulations.

Passation des marchés

The promoter has confirmed to comply with the EU procurement Directives, including publication in the Official Journal. Details of the procedures applied by the promoter will be reviewed during the appraisal.

Statut

Signé - 11/05/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Autriche Énergie