Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20100326
Date de publication: 13 juillet 2010

Promoteur – Intermédiaire Financier

Private

Lieu

Description

Installation of two sections of gas transmission pipeline.

Objectifs

Upgrading of the transmission system which will allow access to gas from more varied sources.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 150 million.

Coût total (montant approximatif)

EUR 400 million.

Aspects environnementaux

The project components are subject to environmental assessments as required by the EIA Directive 85/337/EC and amendments of 1997 and 2003. The technical nature of the components (pipelines) makes them fall under Annex II of the directive. The relevant EIAs are in the process of being completed and submitted to the competent authorities.

Passation des marchés

The promoter is considered a contracting entity in the sense of Article 2 of EU directive 2004/17/EC. The procurement for the project will therefore follow the requirements of the directive as transposed into Polish legislation.

Statut

Signé - 14/07/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Énergie