Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100112
    Date de publication: 21 juin 2010

    Promoteur – Intermédiaire Financier

    Dwr Cymru Cyfyngedig (Welsh Water).

    Lieu

    Description

    The Project forms part of Welsh Water’s capital expenditure programme for the regulatory period 2010-15, with individual schemes located throughout the whole service area.

    Objectifs

    Maintain service levels and improve water management against a backdrop of predicted climate change and demographic developments. The Project also promotes ecoefficiency through energy and resource recovery from operations.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    GBP 100 million.

    Coût total (montant approximatif)

    Estimated to be about GBP 252 million.

    Aspects environnementaux

    The Promoter complies with the requirements of EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The quality and environmental regulators independently monitor compliance with effluent discharge permits and drinking water quality standards.

    Passation des marchés

    Dwr Cymru Cyfyngedig / Welsh Water fully complies with the requirements of Procurement Directive 93/38/EC of June 1993 and its amendment 2004/17/EC as well as 93/37/EEC of 14 June 1993 for public works contracts, 93/36/EEC of 14 June 1993 for public supply contracts, 92/50/EEC of 18 June 1992 for public service contracts and their amendment Directive 2004/18/EC of 31 March 2004.

    Statut

    Signé - 3/03/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Eau, assainissement