The project consists of the development, construction and operation of a hydroelectric plant with associated reservoir and dam.
Objectifs
The objective of the new power unit is to meet increasing demand for electricity in the industrial, residential and commercial sectors.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 70 million.
Coût total (montant approximatif)
Not applicable
Aspects environnementaux
The project, if located in the EU, would fall under Annex I of the EU Directive 85/337/EC as amended and would require a full EIA. An EIA that has included some public consultation has been conducted by the promoter who received an environmental permit already in 2001. During the appraisal the Bank shall verify if the EIA process has been carried out properly and that appropriate mitigation and compensation measures have been put in place.
Passation des marchés
The promoter is a public undertaking under the definition given in the EU Procurement Directive 2004/17/EC. Based on the preliminary information available, the promoter will be procuring the project construction contracts in compliance with such Directive including the relevant publications in the OJEU.
Statut
Signé - 23/03/2011
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).