    Référence: 20090581
    Date de publication: 10 décembre 2009

    Promoteur – Intermédiaire Financier

    Metolong Authority, an implementing agency acting under the Lesotho Ministry of Natural Resources.

    Lieu

    Description

    The project concerns a dam, a water treatment plant, storage tanks and a conveyance system to supply parts of the Lesotho Lowlands including the capital Maseru with additional drinking water. The EIB has been approached to fund the conveyor system only, as the other components including the Metolong Dam itself is fully financed by World Bank, the US Millennium Challenge Corporation, and Arab financial institutions.

    Objectifs

    The project will support the Bank’s strategic lending priorities in support of EU policy objectives. Specifically in regions outside the EU this covers: infrastructure development, environmental protection and improvement and support of EU presence.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 200 million

    Aspects environnementaux

    A comprehensive environmental and Social Impact Assessment (ESIA) according to international best practice standards, including public consultation, was carried out in 2008. That process resulted in an Environmental and Social Action Plan. The ESIA and the action plans will be reviewed during appraisal.

    Passation des marchés

    The Metolong Authority will be responsible for procuring all service, supply and works contracts. For all EIB-funded components, procurement will be based on open international tendering with publication in the EC Official Journal, as applicable. The procurement plan and transparency measures will be subject to a detailed assessment during appraisal.

    Statut

    Signé - 12/08/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Lesotho Eau, assainissement