    Référence: 20090576
    Date de publication: 23 février 2010

    Promoteur – Intermédiaire Financier

    The Irish National Roads Authority (NRA)
    Michael Kennedy

    Lieu

    Description

    The combined N17 /N18 Gort to Tuam PPP scheme is 57 km in length and commences at the northern extremity of the N18 Gort Crusheen scheme, which is currently under construction.

    Objectifs

    This road will replace the existing single carriage-way road, much of which falls below NRA standard in terms of geometry, junction frequency, junction spacing and overtaking opportunities. It is expected that the introduction of the proposed road, with the 120 kph speed limit and superior standard, will result in significant improvements to safety and journey times.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR EUR 170 million.

    Coût total (montant approximatif)

    EUR 530 million.

    Aspects environnementaux

    The project falls under the requirements of Annex I of the EIA Directive 97/11/CE (amended by Directive 2003/35/EC), and is subject of a full Environmental Impact Assessment, including public consultation. Detailed analysis of the EIA process and the project impact and mitigation measures will be performed during appraisal, including assessment of impact on Natura 2000 sites and compliance to Habitats and Birds Directives.

    Passation des marchés

    The project is being procured as a Public Private Partnership. The PPP contract will be awarded under the competitive dialogue procedure applicable to public works contracts under EU Directive 2004/18/EC. The tender was published in the EU Journal on the 3rd of February 2009 (ref. 2009/S22-031253).

    Statut

    Signé - 30/04/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).