    Référence: 20090527
    Date de publication: 28 juin 2010

    Promoteur – Intermédiaire Financier

    Elektroprivreda Srbije - EPS
    Balkanska 6
    11000 Belgrade

    Lieu

    Description

    The project involves the development of a remote reading system within EPS by installing digital electricity meters replacing existing electromechanical devices in selected customer premises.

    Objectifs

    The investment will allow remote reading, disconnection capacity and real time electricity consumption information, automating the billing and invoicing process within Elektroprivreda Srbije (EPS). The project’s implementation will provide more accurate, comprehensive and timely electricity consumption data that will help to reduce the energy consumption and permit the optimisation of power system balance, enhancing the energy efficiency and therefore optimising future investment in transmission and generation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million.

    Coût total (montant approximatif)

    EUR 80 million.

    Aspects environnementaux

    If located in the EU, the project would fall under Annex II of the Directive 85/337/EEC (as amended by 97/11/EC and 2003/35/EC) on Environmental Impact Assessment (EIA), leaving it to the national environmental authority to determine whether an EIA is required. Normally, an ElA would not be expected as the project principally involves the substitution of existing obsolete analogue meters, communications networks (hardware/software) and setting up of data collection centres. Any adverse environmental impact is expected to be minimal. The promoter has a dedicated Environment Management Unit in place.

    Passation des marchés

    The EIB will require the promoter to ensure that contracts financed by the Bank will be tendered with parallel publication of tender notices in the OJEU as and where appropriate.

    Statut

    Signé - 29/11/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Serbie Énergie