Date de publication: 17 août 2009
Promoteur – Intermédiaire Financier
Ministry of Finance.Lieu
Description
This project is a proposed loan allocation under the CCCFL and concerns the design, construction and operation of 10 small scale hydro power plants, with a total capacity of 62 MW. The plants are located in the Yichang prefecture (Hubei province).
Objectifs
The project supports EU and Bank policy objectives with regard to combating climate change and promoting renewable energy generation, contributing to environmental sustainability.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 44 million.
Coût total (montant approximatif)
EUR 71 million.
Aspects environnementaux
If located in the EU, one scheme would fall under the Annex I of the EIA Directive, all other schemes would fall under Annex II. ESIAs have been carried out, including public consultations.
Passation des marchés
Procurement will be undertaken in accordance with the Bank’s Procurement Guidelines.
Statut
À l'examen - 17/08/2009