Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20090296
Date de publication: 4 novembre 2009

Promoteur – Intermédiaire Financier

Federal Republic of Germany

Lieu

Description

The project concerns the widening of a 41 km section of the A8 motorway, part of the TEN-T network, between Ulm and Augsburg, from a 2x2 to 2x3 lane standard.

Objectifs

Upgrading of motorway (from four to six lanes) in order to reduce frequent congestion and a high accident frequency rate.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 250 million

Coût total (montant approximatif)

Currently estimated up to EUR 500 million

Aspects environnementaux

The project falls under Annex I of the EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC and hence an EIA is mandatory. The findings and recommendations of the EIA will be reviewed during the appraisal.

Passation des marchés

The tender was published in the EUOJ on January 29th, 2009 (2009/S 19-026801). The concession will include design, construction, financing, maintenance and operation.

Statut

Signé - 31/05/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Transports