Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090227
    Date de publication: 25 octobre 2010

    Promoteur – Intermédiaire Financier

    City of Torun

    Lieu

    Description

    The project consists of the construction of a bridge and access roads on the Vistula river in the new course of National Road No 1 in Torun, which is part of the trans-European Transport Network, joining it with National Roads No 15 and No 80 in the section from Daszyńskiego Square to Łódzka Street. The total length of the new route is about 4.1 km.

    Objectifs

    The realisation of the project should permit to alleviate the current high traffic pressure on the only existing bridge and on the connected infrastructure on either side of the river, reducing traffic emissions and noise, while improving safety.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to PLN 440 million. (ca. EUR 114 million.)

    Coût total (montant approximatif)

    Up to PLN 1 billion. (ca. EUR 250 million.)

    Aspects environnementaux

    Poland, as a Member State, is obliged to follow the relevant EU rules in relation to the environmental impact of projects (namely SEA, EIA and Habitat/Natura 2000 Directives). The new EIA Polish law, which is fully compliant with EU Directives, entered into force in November 2008. The present project is a new road connection, falling under Annex I of the EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC, therefore a full EIA has been carried out. Details will be checked at appraisal stage.

    Passation des marchés

    The promoter is a public entity subject to EU public procurement regulations. The Bank will require the promoter to ensure that contracts for the implementation of the Project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (mainly Directive 2004/17/EEC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate. All the details will be checked at appraisal stage.

    Statut

    Signé - 17/12/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports