Date de publication: 9 février 2009
Promoteur – Intermédiaire Financier
H2ID Ltd.
P.O. Box 5016
Hamatechet Street
Hasharon Industrial Park
Kadima, 60920
Israel
Lieu
Description
The project concerns the extension of the 100 m m3/year Hadera desalination plant currently under construction (and part financed by the EIB) by adding production capacity to deliver an additional 27 m m3/year.
Objectifs
The project’s main benefit is the increase of available potable water in a region with scarce water resources. The project will contribute to fill the existing gap in the country’s water balance, which is driven mainly by increasing demand which has led to an over-exploitation of the aquifers.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 35 million.
Coût total (montant approximatif)
Up to EUR 70 million.
Aspects environnementaux
According to the promoter and the State of Israel the environmental aspects of the extension are already covered by the existing Environmental Impact Assessment. During appraisal the Bank will assess this aspect and ensure that the EIA complies with the requirements of Directive 97/11/EC for Annex I projects.
Passation des marchés
The project will be awarded through a restricted tender procedure, which is in line with the EIB Guide to Procurement and the requirements of Directive 2004/17/EC (if applicable) for this type of works.
Statut
Signé - 11/06/2009
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).