    Référence: 20080637
    Date de publication: 1 avril 2009

    Promoteur – Intermédiaire Financier

    Unión Fenosa SA

    Lieu

    Description

    The project comprises a large number of independent and geographically dispersed schemes for extending and modernising the promoter’s sub-transmission and distribution electricity networks. The project includes the implementation of 800 km of HV lines, 2700 km of MV lines, 3900 km of LV lines and 1800 MVA of MV/LV transformation capacity. The project capacity will be investigated in detail during appraisal. For the distribution network this will include the analysis of the overall capacities (km and MVA) of the different categories of network equipment (MV lines, LV lines and transformer stations). Description and capacity of the main sub-transmission project schemes (HV voltage lines and substations) will be analysed individually.

    Objectifs

    The project will enable the promoter to cater for demand growth, to enable connection of new system users, and to improve the quality and the reliability of supply in a convergence area.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to 50% of project cost.

    Coût total (montant approximatif)

    Approximately EUR 1 170 million.

    Aspects environnementaux

    Some schemes of the project involving long 220 kV overhead lines will fall under Annex I of the EIA Directive while the remainder will fall under Annex II, leaving it to the national competent authority to decide whether an EIA would be required in line with the screening criteria specified in the directive. Many project schemes are expected to be distribution reinforcements that will not require EIAs and will have minimal or no environmental impact.

    The impacts that can be typically expected for the project schemes relate to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbance during construction. The EIA screening criteria applied by the national competent authority in Spain and the provisions for biodiversity assessment of projects will be investigated during appraisal.

    Passation des marchés

    The promoter is subject to the Public Procurement Act of Spain (Ley 31/2007) that came into force in October 2007 transposing the EU Directives on public procurement. The promoter’s approach for procurement of goods and services in the distribution sectors will be evaluated during appraisal.

    Statut

    Signé - 11/06/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie