    Référence: 20080528
    Date de publication: 29 décembre 2008

    Promoteur – Intermédiaire Financier

    Energias do Brasil (EDB)

    Lieu

    Description

    The project concerns the multi-annual investments on the electricity distribution networks owned/operated by two subsidiaries of EDB (Bandeirante and Escelsa) with voltage ranging from 138 KV to low tension.

    Objectifs

    Contributing to i) support of EU presence in Latin America through Foreign Direct Investment and ii) the economic development of Brazil through improved power supply.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 90 million.

    Coût total (montant approximatif)

    Up to EUR 300 million.

    Aspects environnementaux

    If located in the EU, the project would primarily come under Annex II of the EIA Directive 85/337/EEC as amended by 97/11/EC. The Brazilian environmental authorities require a simplified EIA for installations of 69 kV and above. For low and medium voltage installations below 69 kV there are no requirements for EIAs. Public consultation is not a legal requirement but the promoters arrange it for all schemes requiring an EIA. This will include assessment of compliance with applicable national and EU environmental legislation.The environmental impact from the investment programme will primarily be the visual effect of overhead power lines, noise from transformers and some disturbance during construction, which can be mitigated.

    Example of an EIA for a 138 kV power line is attached below. Other EIAs for this project are found on these links.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the Bank’s Guide to Procurement including publication of tender notices in the Official Journal of the EU as and where appropriate.

    Statut

    Signé - 19/03/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Brésil Énergie