Référence:
20080499
Date de publication: 29 septembre 2010
Date de publication: 29 septembre 2010
Promoteur – Intermédiaire Financier
Trafikverket
Lieu
Description
The construction of a double-track railway tunnel with 2 new stations beneath central Stockholm.
Objectifs
The tunnel will significantly improve the traffic throughput to and from south of Stockholm.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 0.6 billion.
Coût total (montant approximatif)
EUR 2.2 billion.
Aspects environnementaux
Given that an urban railway project falls under Annex II of the directive 85/337/EC, a competent authority decides on the requirement of an EIA and confirms that the project complies with the requirements of the EU nature conservation policy, according to the EU Birds directive (97/409/EEC) and the Habitat directives (92/43/EEC) and Nature 2000.
Passation des marchés
The project is subject to EU public procurement directives (2004/17/EC and 2004/18/EC).
Statut
Signé - 9/12/2010