Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080455
    Date de publication: 7 septembre 2010

    Promoteur – Intermédiaire Financier

    Communauté de l’Agglomération Havraise

    Lieu

    Description

    The project concerns the construction of a first tramway line in Le Havre, which will have 23 stations and a total length of 13.5 km. The Y-shaped route of this line will link the city centre to the Mont-Gaillard and Caucriauville districts, located in the north and east of the city respectively.

    Objectifs

    This first tramway line aims to increase the number of people visiting the city centre, make travel easier between the east and west of the city and open up new districts, thereby supporting the drive for urban renewal and regeneration.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 160 million.

    Coût total (montant approximatif)

    EUR 400 million.

    Aspects environnementaux

    The project comes under Annex II to the Directive on EIAs. An EIA is not strictly necessary although the works will have to be examined by the competent authorities. In this particular case, an EIA was conducted in compliance with national legislation governing environmental protection and public enquiry procedures. Its findings will be examined during the appraisal.

    Passation des marchés

    The promoter must comply with the EU's procurement procedures, including the publication of notices in the OJEU. All contracts exceeding the thresholds set by Community directives will be put out to international tender. Under these conditions, the procurement procedures adopted by the promoter are appropriate for the project and acceptable to the Bank.

    Statut

    Signé - 6/07/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Transports