Date de publication: 26 septembre 2008
Promoteur – Intermédiaire Financier
Ministry of FinanceLieu
Description
This project is a proposed loan allocation under the China Climate Change Framework Loan (CCCFL). Two subprojects are considered:
1 - A carbon sequestration afforestation subproject in arid or semi-arid areas:
The subproject consists of the establishment of approximately 35.000 ha of permanent plantations for wood and fruit production purposes and the related capacity building activities. The project will be developed in nine counties of the Inner Mongolia Autonomous Region.
2 - Forestation and bio-energy development subproject:
The subproject concerns the establishment of some 39,000 ha of plantation for consumption oil and bio-diesel production and some R&D and capacity-building activities. The project will be implemented in 19 counties of the Jiangxi Province.Objectifs
The project supports EU and Bank policy objectives with regard to combating climate change and promoting renewable energy generation. The operation is eligible under the ALA mandate in line with the core objectives of contributing to environmental sustainability.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 50 million.
Coût total (montant approximatif)
EUR 90 million.
Aspects environnementaux
The key objective of this operation is to support projects that help to mitigate climate change and to support sustainable economic development. Most individual schemes to be financed will be small afforestation schemes and are expected to have limited environmental impacts. However, a Strategic Environmental and Social Impact Assessment (SESIA), following the content of the Stategic Environment Impact Directive, will be carried out by the promoter for each project in order to establish the criteria of intervention. The investment schemes shall be prepared in line with the relevant national and EU environmental standards, including due consideration for protection of sites of nature conservation. The adequate mitigating measures in social and environmental aspects will be established in the SESIA and put in place by the promoter.
Passation des marchés
Procurement will be undertaken in accordance with the Bank’s Procurement Guidelines.
Statut
À l'examen - 26/09/2008
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).