Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20080068
Date de publication: 24 juin 2008

Promoteur – Intermédiaire Financier

The National Road and Motorways Authority (GDDKiA)

Lieu

Description

Design, Build, Finance and Operate concession contract for about 180 km of new 2x2 motorway between Strykow in the outskirts of Lodz and Pyrzowice in the outskirts of Katowice on a mixture of new and old alignment.

Objectifs

This section of the A1 lies on the TEN-T Priority Axis Project Number 25, motorway axis Gdansk-Brno/Bratislava-Wien.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to 50% of senior debt, however not higher than 50% of the Project costs.

Coût total (montant approximatif)

To be determined

Aspects environnementaux

The project falls under Annex I of EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC and 92/42/EEC Habitats Directive. A detailed analysis of the impact and mitigation measures will be performed during appraisal.

Passation des marchés

During appraisal, the Bank will review the procurement procedures and their conformity to the provisions of Directive 2004/18/EC.

Statut

Signé - 26/11/2010

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Transports