    Référence: 20070435
    Date de publication: 6 mai 2009

    Promoteur – Intermédiaire Financier

    Kenya Electricity Transmission Company (KETCo)

    Lieu

    Description

    Construction of a 450 km long 400 kV double-circuit power transmission line from Mombasa to Nairobi, construction of a 19 km 220 kV double-circuit line in Nairobi area, and expansion of substations in both Nairobi and Mombasa.

    Objectifs

    The project is primarily intended to transfer power generated in the coast area to the main load centre around Nairobi, the capital. The Government of Kenya’s electrification target is to add 1 million consumers to the grid over the next 5 years. This will require substantial investments in both generation and transmission. Substantial new thermal generation capacity is planned in Mombasa. The project is designed to evacuate this new power capacity to Nairobi.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 60 million.

    Coût total (montant approximatif)

    EUR 214 million.

    Aspects environnementaux

    Due to the project’s characteristics, the Kenyan legislation requires an environmental impact assessment. A consultant has therefore prepared an EIA report which identifies a number of issues such as the vicinity of a national park and the need of moving up to 280 households. Public consultations have highlighted the need for adequate and timely compensation of affected people. The environmental authority has issued its approval of the project.

    Passation des marchés

    Procurement of supplies envisaged to be financed by the EIB will be in line with the Bank’s Guide to Procurement to which the promoter is familiar. Other contracts will also be tendered internationally, in line with the rules of the other lenders involved.

    Statut

    Signé - 21/12/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Kenya Énergie