    Description

    The project involves the reinforcement and extension of the electricity distribution network in Spain, mostly in convergence regions, during the 2008-2009 period. 

     

    Objectifs

    The project consists of an investment programme with the purpose to cater for growing electricity demand, improve quality and reliability of supply, reduce technical losses and comply with legal and regulatory requirements.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 300 million.

    Coût total (montant approximatif)

    Approximately up to EUR 1000 million.

    Aspects environnementaux

    The investment programme comprises mainly substations, medium and low voltage overhead lines, cables, and transformers, most of them extensions to the existing network and expected to have limited visual effects. The large majority of project schemes fall under Annex II of Directive 85/337/EEC amended 97/11/EC. Several project components might fall under Annex I. The promoter prepares systematically environmental studies for all new power lines and substations and submits them with the investment proposals to the competent authorities. For any investment requiring an EIA, the Bank will ensure access to the Non-Technical Summary.

    Passation des marchés

    The promoter follows EU public procurement procedures in accordance with the Utilities Directive 93/38/EC for contract thresholds below those established in Coordinating procurement procedures Directive 2004/17/EC. As standard practice, the promoter periodically publishes tender notices for the prequalification of suppliers and for the award of tenders in the EC Official Journal and in the Boletín Official del Estado (BOE), the Spanish official journal. The promoter has committed himself to implement a uniform procurement procedure that complies with the Directive.

     

    Statut

    Signé - 4/11/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie