    Référence: 20070334
    Date de publication: 11 décembre 2007

    Promoteur – Intermédiaire Financier

    Hastings College of Arts & Technolgy

    Lieu

    Description

    The Project concerns the relocation of the current three College campuses to two newly developed sites at Station Plaza and Ore Valley, both in Hastings. The two new facilities will provide more than 27,000 m² of useable space. These new sites and their improved facilities will be much better suited to meet the needs of the College and its growing student base.

     

    Objectifs

    The Project is a core part of an ongoing investment programme at Hastings College to expand, improve and rationalise its infrastructure, in order to provide the growing student population with an improved learning environment, a better quality of education, and to expand accommodation facilities.

     

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to GBP 7 million. (under an existing Education Framework Facility with Barclays Bank plc, London)

    Coût total (montant approximatif)

    Up to GBP 92 million.

    Aspects environnementaux

    The Project comprises the construction of new facilities for educational activities. Council Directive 85/337/EEC as amended by Directive 97/11/EC and 2003/35/EC on Environmental Impact Assessment (EIA), does not specifically mention facilities for higher education, but these could in some circumstances be seen as urban development projects, thus falling under Annex II of the Directive. The basis for requesting an EIA by the competent authorities will be verified during project appraisal.  

    Passation des marchés

    English Further Education colleges, including Hastings College, are required by the Learning and Skills Council to follow EU procurement guidelines.

    Statut

    À l'examen - 11/12/2007

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Santé