Date de publication: 18 mars 2008
Promoteur – Intermédiaire Financier
Dong Energy A/S, headquartered in Fredericia.
Lieu
Description
The project will consist of the construction of the Horns Rev II off-shore wind farm (up to 210 MWe), located in the North Sea, off the south west coast of Denmark, next to the existing Horns Rev off-shore wind farm.
Objectifs
The development of renewable energy capacity, using an indigenous source of energy, will support European and national targets for renewable energy generation and contribute to diversification of energy supply. Electricity generation from wind will displace fossil fuel-fired generation and thus avoid the associated emissions of CO2, NOx, and SO2. The project is therefore in line with the Bank's priority objectives of supporting renewable energy and the rational use of energy.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 260 million.
Coût total (montant approximatif)
Indicatively estimated at DKK 4140 million. (EUR 555 million)
Aspects environnementaux
By virtue of their technical characteristics, the projects fall under Annex II of Directive 85/337/EEC with regard to Environmental Impact Assessment (EIA). The Bank will review the details of the environmental procedures followed for all sub-schemes of the project, including the results of potential EIAs, mitigating measures to be applied, and any effects on nature conservation sites (“Habitats” Directive 92/43/EEC and the Natura 2000 network).
Passation des marchés
Preliminary information provided to the Bank shows that the project is being implemented under a number of separate contracts. Publications in the EUOJ indicate that procurement procedures applied follow the provisions of relevant national and EU procurement legislation.
Statut
Signé - 16/06/2008
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).