Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20070261
    Date de publication: 3 mars 2008

    Promoteur – Intermédiaire Financier

    The Federal State of the Free and Hanseatic City of Hamburg through a public limited company owned by the City.

    Lieu

    Description

    The project involves the refurbishment, extension, new construction and maintenance of 32 primary and secondary schools in the southern districts of Hamburg. A public limited company obtained the contract for an extensive remodelling programme and the maintenance of the 32 facilities throughout the concession period of 25 years.

    Objectifs

    The project supports investments in new facilities as well as the rehabilitation and modernisation of existing schools. Improving education achievement is a priority for strengthening productivity growth and enhancing residents’ employment prospects. The EIB loan will contribute to the consolidation and modernisation of the schools and therfore to human capital formation and the economic and social development of Hamburg. Therefore the project is fully eligible for EIB funding under Article 267 of the Treaty, point (c) i2i (education).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 300 million

    Aspects environnementaux

    Schools are not specifically mentioned in the EIA Directive on Environmental Impact Assessment, though the project is covered by Annex II of the Directive in relation to urban development. The Bank’s services will verify during appraisal the EIA screening decision of the Competent Authority.

    Passation des marchés

    The Bank will require the promoter to ensure that all relevant contracts for the implementation of the project have been or shall be tendered in accordance with the relevant EU procurement legislation. The detailed procurement issues will be studied during appraisal.

    Statut

    Signé - 24/07/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Éducation