    Description

    The Project consists of the design, construction, commissioning and operation of unloading, storage and re-gasification facilities at the Grain LNG import terminal as part of the terminal's phase 3 development. The main components include a new full containment LNG storage tank and a new jetty with unloading facilities for LNG carriers.

    Objectifs

    The project will provide additional LNG import capacity to accommodate gas from outside UK in view of declining supplies from indigenous sources.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to GBP 160 million.

    Coût total (montant approximatif)

    Estimated to be about GBP 316-320 million.

    Aspects environnementaux

    The Grain LNG terminal expansion phase III was identified by the promoter and the competent authority to classify under Annex II of the EIA Directive 85/337/EEC and its amendments. Due to the size of the development, its location relatively close to nature protection areas and the potentially hazardous impacts related to natural gas the promoter has carried out an EIA as stipulated by the criteria defined in the directive and in the national regulation for such projects. Planning permission was granted from the Medway Council.

    Passation des marchés

    A private sector type procurement approach was followed for the Project, which will be implemented under a lump sum EPC contract, awarded in May this year after international tendering among three pre-qualified companies/consortia.

    Statut

    Signé - 7/03/2008

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Énergie