Date de publication: 9 octobre 2007
Promoteur – Intermédiaire Financier
Société des Autoroutes du Sud de la France (ASF)
Société des Autoroutes Estérel, Côte d’Azur, Provence, Alpes (ESCOTA)
Lieu
Description
The project comprises over one hundred motorway schemes aimed at improving road safety and environmental protection throughout the network operated under concession by the ASF Group and bringing 18 tunnels up to current safety standards, in particular on the A8.
Objectifs
The project forms part of the promoter’s ICAS (additional investment in existing motorways) construction programme (included in the 2007-2011 planning contract between ASF and ESCOTA and the Transport Ministry) aimed at upgrading the two companies’ network. The whole of the network forms part of a transport TEN.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Around EUR 250 million.
Coût total (montant approximatif)
Around EUR 700 million
Aspects environnementaux
Transport projects are subject to the French legislation transposing the corresponding EU directives: SEA (2001/42/EC); EIA (85/337/EEC – 97/11/EC – 2003/35/EC); Habitats (92/43/EEC); and Birds (79/409/EEC – 97/49/EC). As the project promoter is experienced and used to dealing with environmental issues, these should not pose any particular problems. Any motorway schemes likely to have an environmental impact will be subjected to an EIA. The procedures applied will be reviewed at the time of appraisal.
Statut
Signé - 20/12/2007
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).