    Référence: 20060091
    Date de publication: 9 août 2006

    Promoteur – Intermédiaire Financier

    EirGrid plc

    Lieu

    Description

    Upgrading of the national electricity dispatch and control centre for operation of the electricity transmission network, including the purchase of necessary software and hardware, system configuration and consulting services.

    Objectifs

    The project will promote the integration of the electricity transmission networks in Ireland and Northern Ireland, which include areas designated as objective 1. The project will support the establishment of the Single Electricity Market for the island of Ireland and will facilitate cross-border trading of electricity, and improve efficiency and security of supply. These benefits are consistent with the EU objectives to promote the interconnection and interoperability of trans-European energy networks and to support the management and rational use of energy.

    Commentaires

    Electricity, gas and water supply.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to 50% of the project costs.

    Coût total (montant approximatif)

    About EUR 52 million. Some cost variations possible depending on the exact timetable for the project’s implementation.

    Aspects environnementaux

    The project does not come under the Environmental Directive (85/337/EEC as amended by 97/11/EC). The project has minimal environmental impact as its main components are IT hardware/software at the existing National Control Centre based in Dublin. Any structural changes or additional buildings for the project will be subject to the normal planning/consents from national and local authorities.

    Passation des marchés

    The Promoter has confirmed that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 93/38/EEC as amended by 2004/17/EC), with parallel publication of tender notices in the Official Journal of the EU as and where appropriate. The specific procedures will be further evaluated by EIB.

    Statut

    Signé - 21/12/2006

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Énergie