Référence: 20050592
Date de publication: 22 novembre 2006

Promoteur – Intermédiaire Financier

Sustainable Energy Limited (SEL)

Lieu

Description

The proposed project will increase Fiji’s power generation capacity and reduce fuel costs by replacing oil-fired power with a new run-of-river hydro power plant. The project comprises a build, own and operate 38 MW hydropower plant and is part of a larger investment plan in which the Asian Development Bank (ADB) is financing the expansion of transmission and distribution facilities and the World Bank (WB) as well as the EIB (the Bank) will each be supporting individual generation projects.

Objectifs

The project is in line with European and Bank policy objectives to encourage renewable energy generation, where the environmental impacts are lower than fossil fuel supply alternatives. In addition, the project will facilitate the economic development of Fiji by ensuring a consistent power supply and by reducing reliance on highly priced imported fossil fuels. The project falls under the scope of the environmental and economic development goals of the Cotonou Mandate.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 24.50 million.

Coût total (montant approximatif)

EUR 49.10 million.

Aspects environnementaux

According to its technical characteristics the project falls under Annex II of Directive 97/11/EC on Environmental Impact Assessment (EIA) if located within the EU, leaving it to the competent national authority to determine the requirement for an EIA. The competent authority, the Department of Environment has granted all environmental approvals to allow the scheme to proceed.

Passation des marchés

The promoter has agreed to comply with the Bank’s procurement guidelines.

Statut

Signé - 28/11/2006

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Fidji Énergie