Référence: 20050525
Date de publication: 9 mai 2006

Promoteur – Intermédiaire Financier

TENNET TSO BV
Arnhem
The Netherlands

Lieu

Description

580 km submarine power cable link across the North Sea in order to interconnect the Dutch and Norwegian national power systems.

Objectifs

Interconnection of the Dutch and Norwegian national power systems. The project will deepen the internal market in electricity, increase market liquidity and decrease price volatility by enabling the transmission and trade of electricity between The Netherlands and Norway by taking advantage of differences in the generation structures in both countries (predominantly thermal in The Netherlands; hydro in Norway). It will also offer increased security of supply to the relatively tight power systems in the countries concerned.

Commentaires

Electricity transmission

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 280 million

Coût total (montant approximatif)

EUR 572 million

Aspects environnementaux

The environmental impacts of the project have been analysed in detail in all countries concerned. The project does not fall under the EU EIA Directive (85/337/EEC) since it concerns a submarine/underground cable with indoor converter stations. Nevertheless, a full EIA has been carried out in The Netherlands. The authorities in The Netherlands concluded that the project will have no impacts of any significance on any Natura 2000 area. In Norway, all regulatory requirements were fulfilled, and the licensing was done in accordance with all relevant legislation based on international conventions. As regards Danmark and Germany, all relevant impacts were described and relevant reports added in the permit applications, resulting in licenses being granted by the respective authorities.

Passation des marchés

The promoter followed public tendering in compliance with the relevant EU Directive.

Statut

Signé - 22/11/2007

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pays-Bas Énergie